Construction
We consider the August transport of boats finished! The previous two transports arrived in a classic way, safely arriving at designated places. However, this does not mean the end of our work. In the meantime, the set started, whose load was a steel structure for a change. Her ride on the route from Pruszków to Hrebenne took us 2 nights.