Rotator blade
Before the wind power plant starts its work, appropriate components need to be delivered to the place where the rotor is assembled. One of them are the rotor blades. They are 55 meters long. Transport of such oversize load requires great precision.
The transport of the oversize load which the rotor blades are is a challenge. We have considerable experience in this area. As always, we meticulously prepare the transit route. Such a detailed logistics plan allows us to provide the load on time.
The cooperative employees of Silesia Heavy Transport perfectly cope with difficulties encountered. We believe that only a tight team can guarantee that the services will be performed successfully!
The dimensions of wind turbines blades make the organization of their transport to the assembly location to the wind power plant a true test of professionalism for companies operating in the transport sector. Once again we have proved that we are a partner of choice!